 |
 |
|
Control room for gas compression
station, Nigeria including MCC, 3 Generator Panels, Supervisory
Panel, UPS, Air-Conditioning and office area. |
 |
 |
|
Control room for onshore oil
production site in the UK including MCC, ESD system, UPS,
Air-Conditioning, Toilet/Shower and Kitchen. |
 |
 |
|
Water treatment
analyser house for Audi Arabia including
analyser equipment and air-conditioning
(max temperature variation 1 deg. C) |